Ingleside Plaza

Construction at the Ingleside Plaza was completed in late summer. The plaza, which is a pre-engineered building system circa 1979, received a complete exterior overhaul. This is the first renovation the plaza has seen since its original opening. The existing canopy on the building was removed and a new one was installed over the new sidewalk. The north and west walls, along with the north end of the roof were given a fresh coat of paint to freshen up the exterior. A new aluminum entrance door and two new windows were also installed.

 

During construction the tenants continued on with business with no interruptions. This is a challenge that Chevron Construction has overcome on many commercial projects.